Skip to product information
  • Wholesale Transmission Shaft Manufacture
  • Wholesale Transmission Shaft Manufacture
  • Wholesale Transmission Shaft Manufacture

    What are the shipping options?

    1.Sea shipment

    2.By air

    When will I receive my order?

    Once we receive the order,our production manager will calculate the delivery time.Usually production time will take 15-30 days.

    How do I make changes to an order I’ve already placed?

    Just inform us.So we can make adjustments together.

    How do I make sure I order the right size?

    All the items are produced according to standards.

    How do I contact your company if my question isn’t answered here?

    Please write email to us or make a phone call to us.

    PRODUCT NAME Custom Transmisson Shaft CNC lathing machining for Hydraulic Tilt System And Truck Parts 
    MATERIAL: 45 Steel
    Proccessing: Lathing Machine,Welding Machine,Etc
    Tolerance: As per drawing.(-0.02mm-0.06mm)
    QC Control: 100% QC Steps Inspection
    Application Hydraulic System,Auto Industry
    Lead Time: 30-40Days
    OEM/ODM; OEM/ODM Parts are as drawings or samples
    Team: Professional staff over 10 years in Engineering,drawings are accepted
    OEM/ODM; OEM/ODM Parts are as drawings or samples


    Wholesale Transmission Shaft Manufacture