1.Sea shipment
2.By air
Once we receive the order,our production manager will calculate the delivery time.Usually production time will take 15-30 days.
Just inform us.So we can make adjustments together.
All the items are produced according to standards.
Please write email to us or make a phone call to us.
PRODUCT NAME | Custom Steel/Copper Relief Valve CNC Lathing Machining For Hydraulic System In Auto Parts | |||||
MATERIAL: | 6061 Aluminum,Copper | |||||
Proccessing: | CNC Lathing Machinie | |||||
Tolerance: | As per drawing.(+/-0.05mm) | |||||
QC Control: | 100% QC Steps Inspection | |||||
Lead Time: | 30-40Days | |||||
OEM/ODM; | OEM/ODM Parts are as drawings or samples | |||||
Application | Hydraulic System,Auto Industry | |||||
Team: | Professional staff over 10 years in Engineering,drawings are accepted |